FEATURES
Page 2-10
1001 DFB
Drilling & Sawing Line
FICEP
2.3
Pneumatic System
Working pressure
min. 5 bar
max. 6 bar
Connection specifications
shop supply line - min. cable dia.
3/4 gas
FRL connection - min. cable dia.
1/2 gas
NOTE: For more detailed information see Pneumatic System Diagram
DES 29977
Useful data:
Type of normally used oil
HYDRUS 32
Oil quantity required to fill the circuitry
170 litres
System working pressure
75 bar
Summary of Contents for 1001 DFB
Page 1: ...Line Model 1001 DFB Serial number 32292 Programming and operating manual...
Page 2: ...Programming and operating manual Model 1001 DFB 2 FICEP S p A Blank page...
Page 4: ...Programming and operating manual Model 1001 DFB 4 FICEP S p A Blank page...
Page 6: ...Programming and operating manual Model 1001 DFB 6 FICEP S p A Blank page...
Page 10: ...Programming and operating manual Model 1001 DFB 10 FICEP S p A Blank page...
Page 18: ...Programming and operating manual Model 1001 DFB 18 FICEP S p A Blank page...
Page 27: ...Model 1001 DFB Programming and operating manual FICEP S p A 27 Blank page...
Page 35: ...Model 1001 DFB Programming and operating manual FICEP S p A 35 Blank page...
Page 51: ...Model 1001 DFB Programming and operating manual FICEP S p A 51 Blank page...
Page 109: ...Model 1001 DFB Programming and operating manual FICEP S p A 109 Blank page...
Page 115: ...Model 1001 DFB Programming and operating manual FICEP S p A 115 REMARKS...
Page 116: ...Programming and operating manual Model 1001 DFB 116 FICEP S p A REMARKS...
Page 118: ......
Page 122: ......
Page 123: ...1 SAFETY EQUIPMENT AND REGULATIONS...
Page 124: ......
Page 126: ......
Page 127: ...INSTRUCTION AND OPERATOR MANUAL FICEP S p A General Safety EQUIPMENTS HANDLING CHARTS...
Page 128: ......
Page 143: ...SAFETY EQUIPMENT AND REGULATIONS FICEP 1001 DFB Drilling Sawing Line Page 1 15...
Page 147: ...2 FEATURES...
Page 148: ......
Page 164: ......
Page 165: ...3 CONTROLS...
Page 166: ......
Page 181: ...CONTROLS FICEP 1001 DFB Drilling Sawing Line Page 3 15...
Page 182: ......
Page 183: ...4 MACHINE SET UP...
Page 184: ......
Page 195: ...MACHINE SET UP FICEP 1001 DFB Drilling Sawing Line Page 4 11...
Page 225: ......
Page 226: ......