1. Installation CPV−DI02 and CPV−CS02
1−33
Festo P.BE−CPV−DI02−EN en 0704NH
1.
6
E
x
ten
d
in
g
t
h
e
C
PV D
i
r
e
c
t
This section is only relevant for you if you wish to connect
CPI/CP modules to the CPI extension connection.
12
14
12
14
12
14
12
14
12
14
12
14
12
14
12
14
1
1
CPI extension connection
Fig.1/11: CPI extension connection
The rules for CPI systems also apply for extending the
CPVDirect (see section 1.6.1).
You can connect the following CPI/CP modules to the
CPIextension connection:
CP input and output modules
CPI input and output modules (with extended functions)
CPV−SC with CPI connection
CPV/CPA valve terminals with and without extended
functions.
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...