1. Installation CPV−DI02 and CPV−CS02
1−32
Festo P.BE−CPV−DI02−EN en 0704NH
Note
·
Always connect the earth potential to pin 4 of the power
supply connection.
·
Connect the earth connection of the end plate with low
impedance (short cable with large cross−sectional area)
to the earth potential.
·
By means of low−impedance connections, make sure
that the housing of the valve terminal and the earth con
nection at pin 4 have the same potential and that there
are no equalizing currents.
In this way, you will avoid interference caused by electro
magnetic influences.
1
2
4
3
2
24 V
0 V
P
S
MN
S
3 1 2 4
2 A
2 A
1
PE
2
Potential equalization
3
Load voltage can be switched off separately
4
Earth connection at pin 4 designed for 3 A
Fig.1/10: Example of connection with PELV power supply
unit and potential equalization
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...