
1. Installation CPV−DI02 and CPV−CS02
1−26
Festo P.BE−CPV−DI02−EN en 0704NH
1
Cable
2
Strain relief
3
Housing
4
Connecting part
1
2
3
4
Fig.1/8:
Individual socket parts and cable routing
Preparing
When you have selected suitable cables, connect them as
follows (Fig.1/8):
1. Open the socket: Loosen the centre knurled nut.
2. Open the strain relief on the rear of the housing. Pass the
cable through.
3. Remove 5 mm of the insulation from the end of the cable
and fit core end sleeves.
4. Connect the conductors.
5. Replace the connecting part on the housing of the socket
and screw it tight. Pull the cable back so that there are no
loops inside the housing.
6. Tighten the strain relief.
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...