1. Installation CPV−DI02 and CPV−CS02
1−10
Festo P.BE−CPV−DI02−EN en 0704NH
1.2.4
Recognizing the CPI extension with the SAVE button
When the SAVE button is pressed, the CPI/CP modules con
nected to the CPI extension connection will be recognized
automatically.
1. Prepare the connection of the CPV Direct to the power
supply (see section 1.5).
2. Read the sections 1.6 Extending the CPV Direct" and 1.7
Preparing the CPI system for commissioning" for the
exact procedure.
1.2.5
Help table for setting the station number
On the following pages you will find help tables for setting the
station numbers with the DIL switch.
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...