1. Installation CPV−DI02 and CPV−CS02
1−37
Festo P.BE−CPV−DI02−EN en 0704NH
1.
7
Pr
e
p
a
r
in
g
t
h
e
C
PI
s
y
s
te
m
for
c
o
mm
i
ss
i
o
nin
g
This section is only relevant for you if you have connected
CPI/CP modules to the CPI extension connection.
No
te
Do not yet connect the CPV Direct to a higher−order
controller for preparing commissioning.
You will thus avoid addressing faults which may occur in
various field bus systems when address ranges are modi
fied during operation.
1.7.1
Checking the CP strings
Preparations
Before commissioning a CPV Direct with CPI extensions, you
should first prepare each individual CPI system for commis
sioning.
Proceed as follows:
1. Check the pneumatic tubing of the valve terminals with
the aid of the manual override (see pneumatics manual).
2. Check the complete electric circuitry of the CPI system.
3. Save the current string assignment of the CPI system as the
nominal assignment, as described in section 1.7.2.
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...