A. Technical appendix
A−7
Festo P.BE−CPV−DI02−EN en 0704NH
A.2.2
Send parametriziung data
Set_Prm
The parametrizing data are transferred from the DP master
to the valve terminal with the function Set_Prm.
O
c
tet
1: S
t
a
ti
o
n
s
t
a
tu
s
B
it
M
e
a
nin
g
E
xpl
a
n
a
ti
o
n
0
reserved
1
2
3
WD_On
Response monitoring of the CPI system ON/OFF:
0 = OFF
1 = ON
4
Freeze_Req
0 = FREEZE mode not requested by the master
1 = FREEZE mode set by the master
5
Sync_Req
0 = SYNC mode not requested by the master
1 = SYNC mode set by the master
6
Unlock_Req
B
it
7
B
it
6
E
xpl
a
n
a
ti
o
n
7
Lock_Req
0
0
min T
SDR
+ slave parameters may be overwritten
0
1
CPI system released for other masters
1
0
CPI system blocked for other masters
1
1
CPI system released for other masters
Tab.A/1:
Octet 1: Station status
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...