A. Technical appendix
A−8
Festo P.BE−CPV−DI02−EN en 0704NH
Further octets
O
c
tet
D
e
s
i
g
n
a
ti
o
n
E
xpl
a
n
a
ti
o
n
2 and 3
WD_Fact_1
WD_Fact_2
Range 1
Ū
255: The response monitoring time of the
CPI system is transferred with these two octets:
TWD [s] = 10 ms x WD_Fact_1 x WD_Fact_2
4
Minimum Station Delay
Responder (min T
SDR
)
The minimum time the CPI system must wait, before
the reply telegram may be sent to the DP master.
5 and 6
Ident_number
Transmission of the manufacturer identifier of the CPV
Direct (= 0A35C
h
); parametrizing telegrams to the CPI
system are only accepted if the transmitted and the
programmed manufacturer identifiers are the same.
7
Group_Ident
Not supported by the CPI system
8
Ū
32
User_Prm_Data
Not supported by the CPI system
Tab.A/2:
Octets 2
Ū
32
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...