2. Commissioning CPV−DI02 (PROFIBUS−DP)
2−11
Festo P.BE−CPV−DI02−EN en 0704NH
No
te
As from STEP7 V4.02, GSDs are stored within the STEP7
project (station GSD). This can cause the updating/reading
of new GSD files to appear as if incorrect. Please inform
yourself about handling the station GSD files in the STEP7
help.
2. Process the dialogue window Properties PROFIBUS"
Baud rate
Profile
Icons
3. Copy the icon files (see section 2.2) for the CPV Direct
into directory ...\STEP7\S7DATA\NSBMP on your PC or
programmer.
The icon files can either be:
copied manually into the above named directory or
loaded via the menu [Options] [Install new GSD] file
type Bitmap files" in HW Config.
4. Insert a DP master system:
Right−hand mouse click on DP" under CPU" in the rack.
Click on [Add master system] in the context menu.
The line of the DP master system will be displayed.
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...