1. Installation CPV−DI02 and CPV−CS02
1−4
Festo P.BE−CPV−DI02−EN en 0704NH
1
.
2
E
l
ectrica
l
connectin
g
an
d d
isp
l
a
y
e
l
ements
The following connecting and display elements can be found
on the CPV Direct:
1
2
3
4
5
6
1
Field bus connection
(9−pin Sub−D socket, see section 1.3.3)
2
Underneath the removable switch
cover: DIL switches and the SAVE
button (see section 1.2.1)
3
Operating/load voltage connection
(4−pin M12 plug, see section 1.5)
4
Power LEDs PS, PL and bus status
LEDs BF,
P
(see section 3.1)
5
CPI extension connection
(see section 1.6)
6
Switching status displays of the
CPvalve coils (yellow LEDs,
see section 3.1.3)
Fig.1/1:
Connecting and display elements on the CPV Direct
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...