What You Need 

to Get Set Up

Network module

35 mm DIN rail

Two DIN rail locks (included)

Terminal base(s) 

I/O module(s)

11–30 VDC power supply

Accessories: serial cable,
flathead screwdriver

PC running Windows

National Instruments FieldPoint
Software CD

Install the Network Module

Mount the module on a DIN rail.

A. Unlock rail clip.

1

322731e.qxd  4/4/2003  3:40 PM  Page 1

Summary of Contents for FieldPoint FP-1001

Page 1: ...Set Up Network module 35 mm DIN rail Two DIN rail locks included Terminal base s I O module s 11 30 VDC power supply Accessories serial cable flathead screwdriver PC running Windows National Instrume...

Page 2: ...ni com B Hook lip on back of module onto top of DIN rail press down and snap into place NOTE Do not use spliced DIN rails Use only a single DIN rail C Slide module into position and lock rail clip 322...

Page 3: ...minal Base s 2 CAUTION Terminal bases must be connected to the network module before applying power to the module Do not connect or disconnect terminal bases while power is applied to the network modu...

Page 4: ...re there are no gaps between terminal bases E You must install DIN rail locks at each end of the bank to ensure reliable connections between terminal bases and network module Two rail locks are includ...

Page 5: ...ules using the V and C terminals those modules should be grouped together For more accurate measurements place thermocouple modules away from heat sources including network modules and relay modules A...

Page 6: ...he computer s RS 232 port to the 9 position DSub RS 232 connector on the FP 1000 4 NOTE You cannot connect the RS 485 port of the FP 1000 directly to an RS 485 port on the computer You must use an FP...

Page 7: ...resistors Terminate each end of your RS 485 network using the 120 termination resistors included with the FP 1001 Install them between the RX and TX pair of the FP 1000 RS 485 port and between the RX...

Page 8: ...ith the FP 1001 Install them between the RX and TX pair of the host computer RS 485 port and between the RX and TX pair on the RS 485 port of the last FP 1001 in the system as shown Twist the resistor...

Page 9: ...the host computer a unique address Modules on different serial ports may have the same address The addresses of the terminal bases connected to the network module are automatically configured to be se...

Page 10: ...8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3...

Page 11: ...s on the FP 1000 1001 label so that you can refer to them when you configure the software 2 If power is applied to the network module cycle it off and back on again to enable the new settings 11 FP 10...

Page 12: ...equirements of each module Refer to the Specifications section of this document for instructions on calculating the power requirement of the FieldPoint bank B Connect power to the I O modules that req...

Page 13: ...Required Power supply connected to VSUP and COM terminals Shades of gray indicate different voltage potentials CAUTION Cascading power from neighboring bases or network modules defeats isolation betwe...

Page 14: ...0 1001 User Manual for troubleshooting instructions After the hardware is installed you should verify communication configure the modules and configure your power up states and watchdog settings 8 14...

Page 15: ...r or LabWindows CVI before you install the FieldPoint software The FieldPoint software installation installs the LabVIEW VIs and examples and the LabWindows CVI instrument driver only if it finds the...

Page 16: ...solation 2 300 Vrms breakdown Power Requirements Power supply range 11 30 VDC Recommended power supply FP 1000 1001 with up to 5 I O modules 15 W FP PS 4 or equivalent FP 1000 1001 with 6 to 9 I O mod...

Page 17: ...Degree 2 Safety The FP 1000 1001 is designed to meet the requirements of the following standards of safety for electrical equipment for measurement control and laboratory use EN 61010 1 IEC 61010 1 UL...

Page 18: ...regulatory compliance information To obtain the DoC for this product click Declarations of Conformity Information at ni com hardref nsf CE Compliance This product meets the essential requirements of...

Page 19: ...taly 39 02 413091 Japan 81 3 5472 2970 Korea 82 02 3451 3400 Malaysia 603 9131 0918 Mexico 001 800 010 0793 Netherlands 31 0 348 433 466 New Zealand 64 09 914 0488 Norway 47 0 32 27 73 00 Poland 48 0...