1. Installation CPV−DI02 and CPV−CS02
1−24
Festo P.BE−CPV−DI02−EN en 0704NH
1
.
4
Bus
termination
w
ith
termination
resistors
(CPV
−DI
02
)
Note
If the valve terminal is at the beginning or the end of the
field bus system, a bus termination will be required.
·
Fit a bus termination to both ends of a bus segment.
Recommendation:
Use the ready−to−use field bus plugs from Festo for the bus
termination. A suitable resistor network is incorporated in the
housing of this plug (see Fig.1/7).
Receive/send data P
(data cable B)
Receive/send data N
(data cable A)
390
390
220
Pin 6: Supply voltage
Pin 5: Data reference potential
Pin 3
Pin 8
120 nH
120 nH
Fig.1/7:
Circuit diagram for bus termination network
(switch in Festo field bus plug set to ON)
(PROFIBUS−DP: for cable type A as per EN 50170)
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...