1. Installation CPV−DI02 and CPV−CS02
1−39
Festo P.BE−CPV−DI02−EN en 0704NH
Saving the string
assignment
The desired string assignment is generated and saved for
commissioning. In this way the appropriate addresses are
assigned to the connected CPI modules.
Save the string assignments as follows:
1. Leave the power supply for the CPV Direct switched off for
the time being.
2. Make sure that the CPI cables are fastened properly with
the union nut.
3. Switch on the power supply for the CPV Direct and, if
necessary, for the CPI/CP modules with load voltage
connection.
The fault LED
P
on the CPV Direct will flash if CPI/CP
modules are connected or if the string assignment is
modified.
4. Use a small screwdriver or similar tool to press the SAVE
button for at least 1 s (see section Fig.1/3).
This will save the current string assignment as the nom
inal string assignment in the CPV Direct.
The fault LED
P
no longer flashes.
The status LEDs of all the recognized CPI/CP modules
light up.
5. Power OFF/ON
No
te
After saving the string assignment, check the address
assignments of your CPI system before starting user
programs.
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...