2.1 Preparing the CP system for operation on the INTERBUS
2.1.1 Operating voltage
PLEASE NOTE
•
The CP fieldbus node must have a separate
operating voltage supply.
The operating voltage for the remote bus/installation
remote bus is not used by the CP system. This volt-
age is looped through in order to supply further
INTERBUS slaves.
2.1.2 Saving the string assignment
PLEASE NOTE
Before commissioning the CP system, you must first
prepare the CP system (see "CP System" manual).
Before commissioning the CP system on the
INTERBUS, proceed as follows:
1. Connect the operating voltage for the node
(see "CP system" manual).
2. Connect the CP modules.
3. Switch on the operating voltage.
4. Save the string assignment by pressing the SAVE
button.
5. Switch off the operating voltage for the node.
2. Commissioning
CP FB6-E 9809c
2-3
Summary of Contents for Compact Performance CP-FB6-E
Page 1: ...Compact Performance CP fieldbus node 6 Programming and diagnosis Fieldbus protocol INTERBUS...
Page 11: ...Contents and general safety instructions X CP FB6 E 9809c...
Page 12: ...Chapter 1 Installation 1 Installation CP FB6 E 9809c 1 1...
Page 29: ...1 Installation 1 18 CP FB6 E 9809c...
Page 30: ...Chapter 2 Commissioning 2 Commissioning CP FB6 E 9809c 2 1...
Page 58: ...Chapter 3 Diagnosis 3 Diagnosis CP FB6 E 9809c 3 1...
Page 70: ...Appendix A Technical appendix A Technical appendix CP FB6 E 9808c A 1...