Starting the test routine
1. Switch off the operating voltages (pins 1 and 2) at
the node.
2. Switch off the operating voltages at the output
modules.
3. Remove the DIL switch cover.
4. Note the settings of the DIL switch.
5. Set DIL switch element 1 to OFF.
6. Switch on the operating voltages (pins 1 and 2).
7. Set DIL switch element 1 to ON within 5 seconds.
If the 5 second interval is exceeded, the CP valve ter-
minal/CP system will resume normal operation.
Then switch on the operating voltage at the output
modules again.
Stopping the test routine
1. Switch off the operating voltages (pins 1 and 2) of
the terminal.
As DIL switch element 1 is set to
ON = Test routine off
the CP system will start again when the power is
switched on without the test routine.
3. Diagnosis
CP FB6-E 9809c
3-9
Summary of Contents for Compact Performance CP-FB6-E
Page 1: ...Compact Performance CP fieldbus node 6 Programming and diagnosis Fieldbus protocol INTERBUS...
Page 11: ...Contents and general safety instructions X CP FB6 E 9809c...
Page 12: ...Chapter 1 Installation 1 Installation CP FB6 E 9809c 1 1...
Page 29: ...1 Installation 1 18 CP FB6 E 9809c...
Page 30: ...Chapter 2 Commissioning 2 Commissioning CP FB6 E 9809c 2 1...
Page 58: ...Chapter 3 Diagnosis 3 Diagnosis CP FB6 E 9809c 3 1...
Page 70: ...Appendix A Technical appendix A Technical appendix CP FB6 E 9808c A 1...