![Fayat Group BOMAG BW 213 D-5 Operating Instruction, Maintenance Instruction Download Page 54](http://html1.mh-extra.com/html/fayat-group/bomag-bw-213-d-5/bomag-bw-213-d-5_operating-instruction-maintenance-instruction_3690707054.webp)
3.10 Maintenance work
3.10.1 Preliminary remarks
Adhere to the specified operating, maintenance
and repair measures.
The machine must only be serviced by quali-
fied and authorized personnel.
Keep unauthorized persons away from the
machine.
Do not perform maintenance work while the
machine is driving or the engine is running.
Make sure that the engine cannot be acciden-
tally started during maintenance work.
Do not touch hot components.
Before mounting the machine, check whether
all access steps, grips and platforms are free of
obstacles, grease, oils, fuel, dirt, snow and ice.
Use only the intended access steps and grips
to mount the machine.
For overhead maintenance work use the
access steps and working platforms provided
or other secure means.
Do not step on machine parts which are not
intended for this purpose.
Do not leave any tools or other objects, that
could cause damage, in or on the machine.
3.10.2 Work on hydraulic lines
Relieve hydraulic pressures before working on
hydraulic lines. Hydraulic oil escaping under
pressure can penetrate the skin and cause
severe injury. Immediately call for medical
advice when injured by hydraulic oil.
Concerning your safety – Maintenance work
BW 213 D-5
54
Summary of Contents for BOMAG BW 213 D-5
Page 2: ...2...
Page 9: ...1 Introduction Introduction BW 213 D 5 9...
Page 14: ...Introduction Machine type plate and engine type plate BW 213 D 5 14...
Page 15: ...2 Technical data Technical data BW 213 D 5 15...
Page 20: ...Technical data Noise and vibration data BW 213 D 5 20...
Page 21: ...3 Concerning your safety Concerning your safety BW 213 D 5 21...
Page 63: ...4 Display and control elements Display and control elements BW 213 D 5 63...
Page 82: ...Display and control elements Outside of machine BW 213 D 5 82...
Page 83: ...5 Tests before taking into operation Tests before taking into operation BW 213 D 5 83...
Page 95: ...6 Operation Operation BW 213 D 5 95...
Page 124: ...Operation Emergency procedures BW 213 D 5 124...
Page 125: ...7 Loading transporting the machine Loading transporting the machine BW 213 D 5 125...
Page 133: ...8 Maintenance Maintenance BW 213 D 5 133...
Page 207: ...9 Trouble shooting Trouble shooting BW 213 D 5 207...
Page 217: ...10 Waste disposal Waste disposal BW 213 D 5 217...
Page 219: ...11 List of special tools List of special tools BW 213 D 5 219...
Page 220: ...Belt tension tester BOMAG No 079 947 09 Fig List of special tools BW 213 D 5 220...
Page 221: ......
Page 222: ......