![Fayat Group BOMAG BW 213 D-5 Operating Instruction, Maintenance Instruction Download Page 48](http://html1.mh-extra.com/html/fayat-group/bomag-bw-213-d-5/bomag-bw-213-d-5_operating-instruction-maintenance-instruction_3690707048.webp)
In case of unusual noises and development of
smoke perform trouble shooting and have the
fault corrected.
Match the speed to the working conditions.
Do not make extreme steering movements
when driving with high speed, danger of tipping
over!
Always give way to loaded transport vehicles.
Switch the lights on if the visibility is poor.
Always keep a safe distance to excavation pit
borders, embankments and edges.
Refrain from any work that could adversely
affect the stability of the machine.
Do not work with vibration on hard concrete,
cured bitumen layers or extremely frozen
ground.
Always keep a sufficient distance when
passing through subways, under bridges, tun-
nels, electric power lines etc.
3.7.3
Driving on gradients and slopes
Do not drive on gradients exceeding the max-
imum gradability of the machine
Drive extremely carefully on gradients and
always directly up or down the slope.
Soil conditions and weather influences impair
the gradability of the machine.
Wet and loose soils considerably reduce
ground adhesion of the machine on gradients
and slopes. Higher risk of accident!
Concerning your safety – Operating the machine, working operation
BW 213 D-5
48
Summary of Contents for BOMAG BW 213 D-5
Page 2: ...2...
Page 9: ...1 Introduction Introduction BW 213 D 5 9...
Page 14: ...Introduction Machine type plate and engine type plate BW 213 D 5 14...
Page 15: ...2 Technical data Technical data BW 213 D 5 15...
Page 20: ...Technical data Noise and vibration data BW 213 D 5 20...
Page 21: ...3 Concerning your safety Concerning your safety BW 213 D 5 21...
Page 63: ...4 Display and control elements Display and control elements BW 213 D 5 63...
Page 82: ...Display and control elements Outside of machine BW 213 D 5 82...
Page 83: ...5 Tests before taking into operation Tests before taking into operation BW 213 D 5 83...
Page 95: ...6 Operation Operation BW 213 D 5 95...
Page 124: ...Operation Emergency procedures BW 213 D 5 124...
Page 125: ...7 Loading transporting the machine Loading transporting the machine BW 213 D 5 125...
Page 133: ...8 Maintenance Maintenance BW 213 D 5 133...
Page 207: ...9 Trouble shooting Trouble shooting BW 213 D 5 207...
Page 217: ...10 Waste disposal Waste disposal BW 213 D 5 217...
Page 219: ...11 List of special tools List of special tools BW 213 D 5 219...
Page 220: ...Belt tension tester BOMAG No 079 947 09 Fig List of special tools BW 213 D 5 220...
Page 221: ......
Page 222: ......