Protective equip-
ment:
n
Working clothes
n
Protective gloves
n
Safety goggles
1.
Switch off all consuming devices (e.g. igni-
tion, light).
2.
Measure the open-circuit voltage of the
battery at regular intervals (at least 1 x per
month).
ð
Reference values: 12.6 V = fully
charged; 12.3 V = discharged to 50%.
3.
Recharge the battery immediately after an
open-circuit voltage of 12.25 V or less is
reached. Do not perform boost charging.
ð
The open-circuit voltage of the battery
occurs approx. 10 hours after the last
charging process or one hour after the
last discharge.
4.
Switch off the charging current before
removing the charging clamps.
5.
After each charging process allow the bat-
tery to rest for one hour before taking it into
service.
6.
For standstill periods of more than one
month you should always disconnect the
battery. Do not forget to perform regular
open-circuit voltage measurements.
8.11.9.3 Measures before restarting
1.
Replace the fuel filter.
2.
Replace the air filter.
3.
Change engine oil and oil filter.
4.
With storage times in excess of four
months the
®
/DEF container should be
drained and refilled completely with new
AdBlue
®
/DEF.
Maintenance – As required
BW 213 D-5
205
Summary of Contents for BOMAG BW 213 D-5
Page 2: ...2...
Page 9: ...1 Introduction Introduction BW 213 D 5 9...
Page 14: ...Introduction Machine type plate and engine type plate BW 213 D 5 14...
Page 15: ...2 Technical data Technical data BW 213 D 5 15...
Page 20: ...Technical data Noise and vibration data BW 213 D 5 20...
Page 21: ...3 Concerning your safety Concerning your safety BW 213 D 5 21...
Page 63: ...4 Display and control elements Display and control elements BW 213 D 5 63...
Page 82: ...Display and control elements Outside of machine BW 213 D 5 82...
Page 83: ...5 Tests before taking into operation Tests before taking into operation BW 213 D 5 83...
Page 95: ...6 Operation Operation BW 213 D 5 95...
Page 124: ...Operation Emergency procedures BW 213 D 5 124...
Page 125: ...7 Loading transporting the machine Loading transporting the machine BW 213 D 5 125...
Page 133: ...8 Maintenance Maintenance BW 213 D 5 133...
Page 207: ...9 Trouble shooting Trouble shooting BW 213 D 5 207...
Page 217: ...10 Waste disposal Waste disposal BW 213 D 5 217...
Page 219: ...11 List of special tools List of special tools BW 213 D 5 219...
Page 220: ...Belt tension tester BOMAG No 079 947 09 Fig List of special tools BW 213 D 5 220...
Page 221: ......
Page 222: ......