![Fayat Group BOMAG BW 213 D-5 Operating Instruction, Maintenance Instruction Download Page 185](http://html1.mh-extra.com/html/fayat-group/bomag-bw-213-d-5/bomag-bw-213-d-5_operating-instruction-maintenance-instruction_3690707185.webp)
Protective equip-
ment:
n
Working clothes
n
Protective gloves
1.
Move the drum, until the oil level inspection
plug is in bottom position.
2.
Park the machine in secured condition
Chapter 6.7 „Park the machine in
secured condition.“ on page 115
.
3.
Clean the area around the level inspection
plug and unscrew the plug.
4.
Drain and catch all oil.
5.
Move the drive wheel, until the oil level
inspection plug is in horizontal position.
6.
Fill in oil through the inspection bore, until it
starts to run out through the level inspec-
tion bore.
7.
Turn the level inspection plug tightly back
in.
8.
Change the oil in both wheel hubs.
9.
Dispose of oil environmentally.
8.9.6
Change the oil in the exciter housing
NOTICE!
Components may get damaged!
– Drain gear oil only at operating
temperature.
– Use only gear oil of the permitted
specification
.
– Filling quantity:
Fig. 145
Fig. 146
Maintenance – Every 1000 operating hours
BW 213 D-5
185
Summary of Contents for BOMAG BW 213 D-5
Page 2: ...2...
Page 9: ...1 Introduction Introduction BW 213 D 5 9...
Page 14: ...Introduction Machine type plate and engine type plate BW 213 D 5 14...
Page 15: ...2 Technical data Technical data BW 213 D 5 15...
Page 20: ...Technical data Noise and vibration data BW 213 D 5 20...
Page 21: ...3 Concerning your safety Concerning your safety BW 213 D 5 21...
Page 63: ...4 Display and control elements Display and control elements BW 213 D 5 63...
Page 82: ...Display and control elements Outside of machine BW 213 D 5 82...
Page 83: ...5 Tests before taking into operation Tests before taking into operation BW 213 D 5 83...
Page 95: ...6 Operation Operation BW 213 D 5 95...
Page 124: ...Operation Emergency procedures BW 213 D 5 124...
Page 125: ...7 Loading transporting the machine Loading transporting the machine BW 213 D 5 125...
Page 133: ...8 Maintenance Maintenance BW 213 D 5 133...
Page 207: ...9 Trouble shooting Trouble shooting BW 213 D 5 207...
Page 217: ...10 Waste disposal Waste disposal BW 213 D 5 217...
Page 219: ...11 List of special tools List of special tools BW 213 D 5 219...
Page 220: ...Belt tension tester BOMAG No 079 947 09 Fig List of special tools BW 213 D 5 220...
Page 221: ......
Page 222: ......