Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
27
2
Site Preparation
This chapter describes how to prepare your site for installing Extreme Networks equipment. It contains
information about environmental and cabling requirements, power requirements, and building and
electrical code organizations.
This chapter includes these sections:
•
Planning Your Site on page 28
•
Meeting Site Requirements on page 28
•
Planning for Stacking on page 41
•
Evaluating and Meeting Cable Requirements on page 44
•
Meeting Power Requirements on page 49
•
Applicable Industry Standards on page 53
•
Planning for Optical Budgets on page 53
The requirements described in this chapter are intended for the system administrator, network
equipment technician, or network manager who is responsible for installing and managing the network
hardware. It assumes a working knowledge of local area network (LAN) operations, and a familiarity
with communications protocols that are used on interconnected LANs. Installation, maintenance, and
removal of a switch, chassis, or its components must be done by qualified service personnel only.
Qualified service personnel have had appropriate technical training and experience that is necessary to
be aware of the hazards to which they are exposed when performing a task and of measures to
minimize the danger to themselves or other people.
By carefully planning your site, you can maximize the performance of your existing network and
ensure that it is ready to migrate to future networking technologies.
To learn more about safety issues and to ensure safety compliance, see Appendix A.
WARNING!
Read the safety information in Appendix A thoroughly before installing your Extreme Networks switch.
Failure to follow this safety information can lead to personal injury or damage to the equipment.
Summary of Contents for Alpine 3802
Page 18: ...18 Extreme Networks Consolidated i and e Series Hardware Installation Guide Preface ...
Page 19: ...Part 1 Common Features ...
Page 20: ......
Page 25: ...Part 2 Site Planning ...
Page 26: ......
Page 56: ...56 Extreme Networks Consolidated i and e Series Hardware Installation Guide Site Preparation ...
Page 57: ...Part 3 Summit Switch ...
Page 58: ......
Page 137: ...Part 4 Alpine Switch ...
Page 138: ......
Page 213: ...Part 5 BlackDiamond Switch ...
Page 214: ......
Page 303: ...Part 6 Switch Operation ...
Page 304: ......
Page 307: ...Part 7 Appendixes ...
Page 308: ......