4
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
Operating Environment Requirements
29
Rack Specifications and Recommendations
39
Planning for Stacking
41
Maximum Switches in a Stack
41
Planning Switch Placement in the Rack
43
Evaluating and Meeting Cable Requirements
44
Cabling Standards
44
Cable Labeling and Record Keeping
45
Installing Cable
45
RJ-45 Connector Jackets
48
Radio Frequency Interference
48
Making Network Interface Cable Connections
49
Meeting Power Requirements
49
Power Supply Requirements
50
AC Power Cable Requirements
50
DC Power Requirements
51
Replacing the Power Cable
52
Uninterruptable Power Supply Requirements
52
Applicable Industry Standards
53
Planning for Optical Budgets
53
Long-Range GBIC System Budgets
54
Part 3
Summit Switch
Chapter 3
Summit Switch Models
Summit 200 “
e
” Series Switches
60
Summit 200 “
e
” Series Switch Features
60
Summit 200 Series Switch Physical Description
61
Summit 200 Switch LEDs
63
Console Port
63
Port Connections
64
Summit 200 Automatic Failover
64
Full-Duplex Support
65
Summit 300 “e” Series Switches
65
Summit 300 Features
66
Summit 300-24 Switch
66
Summit 300-48 Switch
70
Summit 300-48 Switch LEDs
71
Load Sharing Power Supplies
73
Summit 300 Automatic Failover
74
Summit 400 “
e
” Series Switches
75
Summit 400-24 Switches
75
Summary of Contents for Alpine 3802
Page 18: ...18 Extreme Networks Consolidated i and e Series Hardware Installation Guide Preface ...
Page 19: ...Part 1 Common Features ...
Page 20: ......
Page 25: ...Part 2 Site Planning ...
Page 26: ......
Page 56: ...56 Extreme Networks Consolidated i and e Series Hardware Installation Guide Site Preparation ...
Page 57: ...Part 3 Summit Switch ...
Page 58: ......
Page 137: ...Part 4 Alpine Switch ...
Page 138: ......
Page 213: ...Part 5 BlackDiamond Switch ...
Page 214: ......
Page 303: ...Part 6 Switch Operation ...
Page 304: ......
Page 307: ...Part 7 Appendixes ...
Page 308: ......