www.exacq.com
+1.317.845.5710
+5255.56080817
+44.1438.310163
USA (Corporate Headquarters)
Mexico
Europe/Middle East/Asia
50
To configure an archive task schedule, complete the following steps in the Task Schedule section on the Target tab:
1.
Click New.
2.
Enter a name for the archive task.
3.
Select a Start Time.
4.
Select an End Time. There are three types of end times:
Continuous.
The system will scan for data to archive every five minutes. (See the note at the
beginning of this section before selecting this option.)
Until Finished.
Archiving will continue until all applicable data is archived. There will be no
additional scans for data to archive until the start time on the next day.
User Defined.
Archiving will end at the specified end time. Enter the time desired. If the archive
period is not long enough to archive all applicable data, the remaining data will be archived
during the next applicable task.
NOTE:
The oldest applicable data will always be archived first. If you see a message in the Status
section (see the next page) that indicate the archive didn’t complete, consider increasing the
length of the user-defined task. Also, any applicable data recorded while the archive task is in
progress will be archived if there is enough time remaining in the task.
5.
If you select Until Finished or User Defined, select a Frequency for the task. Custom allows you to select
days of the week individually.
6.
Click Apply.
If desired, you can configure multiple archive tasks.
1
2
3
4
5
6