33
0-Instalacio
n sw113.fm
- 29
/4/21
English
Automatic swing door PREMIS 200
11
INSTALLATION
1
TOOLS AND MATERIALS
Tool
•
Drill
•
Drill bits: ø 4.2 mm - ø 5 mm - ø 6 mm
•
Set of Allen keys: 2,5 - 4 - 5
•
Set of screwdrivers: Phillips - flathead
•
Open-end wrench: 13
•
Scissors
•
Wire strippers
•
Pencil
•
Tape measure
•
Spirit level
2
INITIAL CONDITIONS AND CHECKS
Initial conditions of the door
Check that the size of the door is within the
admissible range of the operator (see the
operator's technical characteristics).
Do not install the operator in a door which
does not work correctly in manual operation,
as this may lead to accidents. Repair the door
before installing.
The door must be provided with an opening
stopper.
The door must be easy to handle manually, namely:
• It must be balanced.
• There should be no stiffness throughout its
open/close.
Ambient conditions
This device is not suitable for installation in
inflammable or explosive environments.
Check that the admissible ambient
temperature range for the operator is suitable.
Electrical power supply installation
Ensure the power supply installation meets the following requirements:
• Rated voltage equal to that specified.
• Installation power greater than required
power.
• The electrical installation must comply with
low voltage regulations.
• The installation must be earthed.
3
UNPACKING
1
Open the package and remove the contents from
within.
2
Check the contents of the package (see figure
below).
If it is noticed that a piece is missing or deteriorated,
contact the nearest technical service.
}
Discard the packaging in an environmentally friendly
manner, using recycling containers.
4
CONTENTS
1
Swing operator
2
Packing box
3
Protectors
4
Installation guide / user guide
5
Screw set
6
Erreka Sticker