73
Scheduling
The
S
CHEDULING
function allows the user to create and modify schedules to control the changing of Suction
Pressure or Process Temperature Setpoints based on the day of the week and time of day. The following sections
will describe the various screens associated with this function.
Scheduling
1. CONTROL
2. ACTIVE GROUP
3. ACTIVE SCHED
4. WEEKLY SCHED
5. DAILY SCHED
Control
The
C
ONTROL
screen allows the user to determine if equipment operation will be controlled by predefined schedules.
An example of this screen is shown below.
The following table lists the data entry fields and a description of their purposes.
TERMS
DEFINITION
RANGE
SCHEDULING
Allows the Setpoint Scheduling feature to be enabled or disabled
ENABLED/DISABLE
Scheduling Control Screen
Scheduling Definition
Summary of Contents for Vilter VilTech
Page 1: ...VILTech micro controller Operation and service manual ...
Page 2: ...2 ...
Page 10: ...10 Notes Page ...
Page 11: ...11 ...
Page 16: ...16 ...
Page 18: ...18 ...
Page 29: ...29 ...
Page 38: ...38 ...
Page 53: ...53 ...
Page 88: ...88 ...
Page 138: ...138 ...
Page 142: ...142 ...
Page 145: ...145 ...
Page 147: ...147 ...
Page 153: ...153 ...
Page 154: ...154 Alarm and Failure Data ...
Page 155: ...155 Alarm and Failure Data Continued ...
Page 156: ...156 Alarm and Failure Data Continued ...
Page 158: ...158 Compressor State Table ...
Page 159: ...159 Last RECIPStart Status Table ...
Page 172: ...172 ...
Page 173: ......