Figure 2-5: Purge Power and Alarm Entry Point Connections
Electrical protection for the instrumentation circuitry of the analyzer is provided by fuses
F1 and F2 located inside the analyzer. Refer to
Figure 2-6
.
The customer supplied power cable for the analyzer instrumentation will be connected to
terminals 1 - 3.
Table 2-2: Electrical Power Requirements
Electrical supply
Power
consumption
Voltage
Fuse
Instrumentation supply
voltage
400 W
100 to 230 Vac, 50/60 Hz ±10%
3.15 A
internal
fuses
F1 and F2
Purge supply voltage
100 to 230 Vac, 2.3
VA (without digital
valve)
100 to 240 Vac, 48/62 Hz ± 10%,
single phase Overvoltage
category 2
AC: 2.0A
Quick Start Guide
Install
D-7010-0055
August 2018
Quick Start Guide
29
Summary of Contents for Rosemount CT5100 Ex
Page 1: ...Quick Start Guide D 7010 0055 Rev C August 2018 Rosemount CT5100 Ex Continuous Gas Analyzer ...
Page 12: ...Contents Quick Start Guide August 2018 D 7010 0055 12 Rosemount CT5100 Ex ...
Page 34: ...Install Quick Start Guide August 2018 D 7010 0055 34 Rosemount CT5100 Ex ...
Page 44: ...Operating the analyzer Quick Start Guide August 2018 D 7010 0055 44 Rosemount CT5100 Ex ...
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......