Figure 2-2: Gas Inlet and Outlet Connectors
A. Sample gas return port
B. Sample gas input port
C. Top cover of Rosemount CT5100(Ex) (cell compartment)
D. Purge air supply
E. Laser/electrical compartment
3. The sample supply line must be heated all the way to the sample gas input port on
the analyzer to prevent condensation forming at any point in the sample supply
line.
2.3
Connecting the electrical/electronic inputs and
outputs
2.3.1
AC power
Power is connected to the analyzer instrumentation through the power entry point (B) and
the purge controller through the purge power and alarm entry point (A) fitted to the base
of the analyzer. Refer to
Figure 2-3
.
Install
Quick Start Guide
August 2018
D-7010-0055
26
Rosemount
™
CT5100 Ex
Summary of Contents for Rosemount CT5100 Ex
Page 1: ...Quick Start Guide D 7010 0055 Rev C August 2018 Rosemount CT5100 Ex Continuous Gas Analyzer ...
Page 12: ...Contents Quick Start Guide August 2018 D 7010 0055 12 Rosemount CT5100 Ex ...
Page 34: ...Install Quick Start Guide August 2018 D 7010 0055 34 Rosemount CT5100 Ex ...
Page 44: ...Operating the analyzer Quick Start Guide August 2018 D 7010 0055 44 Rosemount CT5100 Ex ...
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......