Figure 2-3: Power Gland
A. Purge Power and Alarm Entry Point
B. Power Entry Point
•
A purge electrical and alarm supply that is used to power the overpressure facility in the
electrical compartment of the analyzer. Refer to
Figure 2-3
(Item A).
•
An instrumentation electrical supply that is used to power all other functions of the
analyzer. See
Figure 2-3
(Item B).
The customer supplied circuit breakers
must
be in accordance with ATEX / IECEx / North
American protection concepts. The main power isolator controls the application of
electrical power to the purge controller with the secondary power isolator controlling the
application of electrical power to the remaining analyzer functions.
Quick Start Guide
Install
D-7010-0055
August 2018
Quick Start Guide
27
Summary of Contents for Rosemount CT5100 Ex
Page 1: ...Quick Start Guide D 7010 0055 Rev C August 2018 Rosemount CT5100 Ex Continuous Gas Analyzer ...
Page 12: ...Contents Quick Start Guide August 2018 D 7010 0055 12 Rosemount CT5100 Ex ...
Page 34: ...Install Quick Start Guide August 2018 D 7010 0055 34 Rosemount CT5100 Ex ...
Page 44: ...Operating the analyzer Quick Start Guide August 2018 D 7010 0055 44 Rosemount CT5100 Ex ...
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......