TRANSIENT3000
94/162
"failed". Protocol shows " test
failed"
display at test end.
For the interruption and Variation test the EUT Power 1 input on the rear side of the TRA3000 F-S-D-V-C
must be connected to the public power mains. Connecting the TRANSIENT to the public power mains is
explained in Chapter 5.
6.3.1.8 Magnetic Field
test in operation
EUT power v, i
test voltage and test
time
type of induction coil to
use and current range
of the induction coil
indicates the status of the actual
test
when the operator visually detects
an EUT failure, F4 can be pressed
and the status of the test turns to
"failed". Protocol shows " test
failed"
by pressing "Mark" the actual test
parameter will be written in the
protocol and showed on the
display at test end.
6.3.1.9 Interruption on d.c.
test in operation
EUT power v, i, +++
Voltage will be indicated
when on PWR1 on the
rear of TRA3000 a d.c.
voltage is connected
test in operation
EUT power v, i, +++
Voltage will be indicated
when on PWR1 on the
rear of TRA3000 a d.c.
voltage is connected
Indicates the test
parameter
test in operation
EUT power v, i, +++
Voltage will be indicated
when on PWR1 on the
rear of TRA3000 a d.c.
voltage is connected
Indicates the test
parameter
Summary of Contents for EXTTRA3000 E
Page 8: ...TRANSIENT3000 8 162...
Page 102: ...TRANSIENT3000 102 162...
Page 106: ...TRANSIENT3000 106 162...
Page 116: ...TRANSIENT 2000 116 162...
Page 118: ...TRANSIENT 2000 118 162...
Page 142: ...11BRemote Ports 142 162 All Generators of EMCP can be loaded and demonstrated...
Page 148: ...12BAppendix and Corrections 148 162 13 1 6 VARIATION Specification IEC 61000 4 11 Ed 2...
Page 150: ...12BAppendix and Corrections 150 162...
Page 156: ...14BIndex 156 162...
Page 158: ...14BIndex 158 162...
Page 160: ...14BIndex 160 162...
Page 162: ...14BIndex 162 162...