TRANSIENT3000
64/162
test in operation
EUT power v, i ++++
test voltage and time
bar. white indicates the
actual test time carried
out
tests parameters
indicates the status of the actual
test.
when the operator detects visual a
EUT failure, F4 can be pressed
and the status of the test turns to
"failed". Protocol shows " test
failed"
by pressing "Mark" the actual test
parameter will be written in the
protocol and showed on the
display at test end.
When in OPTIONS –Preferences- Default Path for Protocol the Web server is selected the protocol will be
shown as an html document.
Well that's easy isn't it ?
All other programmed tests can be started and carried out in the same way. All test can be started or
stopped with the "RUN" button.
The quick-start tests contain only a small part of the testing possibilities of the TRA3000 F-S-D-V-C.
In the next two sections, the additional possibilities of the TRA3000 F-S-D-V-C will be explained in
detail.
Summary of Contents for EXTTRA3000 E
Page 8: ...TRANSIENT3000 8 162...
Page 102: ...TRANSIENT3000 102 162...
Page 106: ...TRANSIENT3000 106 162...
Page 116: ...TRANSIENT 2000 116 162...
Page 118: ...TRANSIENT 2000 118 162...
Page 142: ...11BRemote Ports 142 162 All Generators of EMCP can be loaded and demonstrated...
Page 148: ...12BAppendix and Corrections 148 162 13 1 6 VARIATION Specification IEC 61000 4 11 Ed 2...
Page 150: ...12BAppendix and Corrections 150 162...
Page 156: ...14BIndex 156 162...
Page 158: ...14BIndex 158 162...
Page 160: ...14BIndex 160 162...
Page 162: ...14BIndex 162 162...