TRANSIENT3000
93/162
6.3.1.5 DIPS less than 1 period
test in operation
EUT power v, i
test voltage and test
time
half period dips
test parameter
indicates the status of the actual
test
when the operator visually detects
an EUT failure, F4 can be pressed
and the status of the test turns to
"failed". Protocol shows " test
failed"
by pressing "Mark" the actual test
parameter will be written in the
protocol and showed on the
display at test end.
For the interruption and Variation test the EUT Power 1 input on the rear side of the TRA3000 F-S-D-V-C
must be connected to the public power mains. Connecting the TRANSIENT to the public power mains is
explained in Chapter 5.
To stop the running test, press the RUN button.
6.3.1.6 DIPS more than 1 perode
test in operation
EUT power v, i
test voltage and test
time
test parameter
indicates the status of the actual
test
when the operator visually detects
an EUT failure, F4 can be pressed
and the status of the test turns to
"failed". Protocol shows " test
failed"
by pressing "Mark" the actual test
parameter will be written in the
protocol and showed on the
display at test end.
For the interruption and Variation test the EUT Power 1 input on the rear side of the TRA3000 F-S-D-V-C
must be connected to the public power mains. Connecting the TRANSIENT to the public power mains is
explained in Chapter 5.
To stop the running test, press the RUN button.
6.3.1.7 Variation
test in operation
EUT power v, i
test voltage and test
time
test parameter
indicates the status of the actual
test
when the operator visually detects
an EUT failure, F4 can be pressed
and the status of the test turns to
by pressing "Mark" the actual test
parameter will be written in the
protocol and showed on the
Summary of Contents for EXTTRA3000 E
Page 8: ...TRANSIENT3000 8 162...
Page 102: ...TRANSIENT3000 102 162...
Page 106: ...TRANSIENT3000 106 162...
Page 116: ...TRANSIENT 2000 116 162...
Page 118: ...TRANSIENT 2000 118 162...
Page 142: ...11BRemote Ports 142 162 All Generators of EMCP can be loaded and demonstrated...
Page 148: ...12BAppendix and Corrections 148 162 13 1 6 VARIATION Specification IEC 61000 4 11 Ed 2...
Page 150: ...12BAppendix and Corrections 150 162...
Page 156: ...14BIndex 156 162...
Page 158: ...14BIndex 158 162...
Page 160: ...14BIndex 160 162...
Page 162: ...14BIndex 162 162...