12BAppendix and Corrections
146/162
13.1.4 DIPS Specification
Test Level
% UT
Voltage
Dip/int
% UT
Duration
(in period)
0
100
0.5*
5
10
40
60
25
50
x
70
30
Prüflevel : Spannungsunterbrüche
U
T
Test Level 70%
Dip 30%
In addition to the data showed in the figure, such as test levels, duration of the interruption, transition time,
etc., the inrush current must be tested. Electronic equipment very often contain inrush current limitation
circuits. These inrush limiting circuits are often bypassed during interrupts at the turn on part.
Consequences are defective power switching modules, or the equipment can not be turned on after the test
because the software has not made a restart etc.
So that the test will cover this aspect, the inrush current capability of the generator must be at least 500 A
peak. The verification of the generator inrush current is defined as follow:
Turn on the generator at a phase angle of 90 degrees. Using a current sensor, measure the current in a
capacitor of several µF. The measured amplitude must be equal to/or greater than 500 A. When the tester
can generate a current amplitude of 500 A, all equipment with current consuming up to 16 A can then be
tested.
If the current amplitude of 500 A is not reached, then the inrush current of the EUT must be measured. The
inrush current of the tester must be a minimum of 30 % higher than the inrush current of the EUT.
Test levels DIPS
Summary of Contents for EXTTRA3000 E
Page 8: ...TRANSIENT3000 8 162...
Page 102: ...TRANSIENT3000 102 162...
Page 106: ...TRANSIENT3000 106 162...
Page 116: ...TRANSIENT 2000 116 162...
Page 118: ...TRANSIENT 2000 118 162...
Page 142: ...11BRemote Ports 142 162 All Generators of EMCP can be loaded and demonstrated...
Page 148: ...12BAppendix and Corrections 148 162 13 1 6 VARIATION Specification IEC 61000 4 11 Ed 2...
Page 150: ...12BAppendix and Corrections 150 162...
Page 156: ...14BIndex 156 162...
Page 158: ...14BIndex 158 162...
Page 160: ...14BIndex 160 162...
Page 162: ...14BIndex 162 162...