TRANSIENT3000
44/162
4.1.2 Operation panel
Fig. 4.1.2
4.1.2.1 Button Run (19)
With the „Run“ button, a test can be started or interrupted.
4.1.2.2 Manual Trigger (21)
When manual trigger is programmed and the tester is ready for manual trigger, this will be indicated by the
LED. As soon as the signal occurs the pulse can be released by pressing the manual trigger button.
4.1.2.3 Signalling the EMC test type(26)
The LED (26) signals which of the seven possible EMC test is chosen: ESD, EFT, SURGE, DIPS,
Variation, Magnetic field, Common Mode. A continuous signal indicates which test has been selected in
set-up, while a blinking signal indicates that the test is running.
4.1.2.4 Indication of the coupling path (22)
The four LEDs indicate which path is receiving the disturbance . The three lines of the EUT power, or the
direct high voltage outputs. The signals appear as soon as a test is active. With the buttons above the LED
indicators, coupling path can be changed also during operation.
4.1.2.5 Single phase power output power plug Schuko(23) or banana plug (33) type.
When superposing the disturbance onto the EUT power line, the power cord of the EUT must be connected
with the Socket (23). EMC PARTNER offers adapters for the different types of power cord connectors for
different countries.
19 20 21
22
23
24
36
25
26
27
29
30
31
33
34
35
32
Summary of Contents for EXTTRA3000 E
Page 8: ...TRANSIENT3000 8 162...
Page 102: ...TRANSIENT3000 102 162...
Page 106: ...TRANSIENT3000 106 162...
Page 116: ...TRANSIENT 2000 116 162...
Page 118: ...TRANSIENT 2000 118 162...
Page 142: ...11BRemote Ports 142 162 All Generators of EMCP can be loaded and demonstrated...
Page 148: ...12BAppendix and Corrections 148 162 13 1 6 VARIATION Specification IEC 61000 4 11 Ed 2...
Page 150: ...12BAppendix and Corrections 150 162...
Page 156: ...14BIndex 156 162...
Page 158: ...14BIndex 158 162...
Page 160: ...14BIndex 160 162...
Page 162: ...14BIndex 162 162...