Service
109
Fig. 93: Solenoid valve 3/2
–
Turn the power switch to pos.0.
–
Unplug the main power plug as well.
–
Remove the connector (7).
–
Unscrew the nut (1).
–
Remove the coil (2) (only with the 2/2 valve).
–
Unscrew counter-clockwise the hexagon screw on the plunger housing.
–
Remove the plunger (5) (only with the 2/2 valve)
Caution
Do not lose the spring (4)!
–
With oxygen pressure or compressed air, clean the inside of the plunger housing(3), as
well as the plunger (5) and re-assemble the solenoid valve. With the furnace closed and
renewed oxygen pressure, check to ensure that the solenoid valve is sealed.
2
4
5
7
1
2
3
4
5
7
1
3
6
6
3 - 1 3 - 1
Summary of Contents for CS-2000
Page 2: ...2 Copyright Copyright by Eltra GmbH Retsch Allee 1 5 D 42781 Haan Germany ...
Page 6: ...Notes on service instructions 6 ...
Page 77: ...Adjustments 77 Fig 61 IRC 1 3 ...
Page 107: ...Service 107 Fig 91 Tubes to squeeze ...
Page 120: ...Miscellaneous 120 6 1 2 Left hand side Fig 106 Left hand side view ...
Page 122: ...Miscellaneous 122 6 1 3 Right hand side Fig 107 Right hand side view ...
Page 129: ...Miscellaneous 129 6 1 7 Infrared cell Fig 111 Infrared cell ...
Page 139: ...Miscellaneous 139 Fig 119 Left hand side power wiring 6 2 3 Valve wiring ...
Page 142: ...Miscellaneous 142 6 2 6 IR cell internal signals Fig 123 IR current supply new version ...
Page 145: ...Miscellaneous 145 6 3 2 Gas flow for induction furnace when furnace is open ...
Page 146: ...Miscellaneous 146 6 3 3 Gas flow for resistance furnace ...
Page 147: ...Miscellaneous 147 6 3 4 Valve contolling ...
Page 160: ...Copyright Copyright by Eltra GmbH Retsch Allee 1 5 D 42781 Haan Germany ...