
gas-lab
Q1
Page v
Safety and warning notes
To ensure a safe and faultless operation of the device the instructions and
notes contained in the documentation on hand must be observed.
The device must be used as prescribed and connected according to the
connection diagram. The national and local regulations for electrical
installations must be observed.
The mounting, electrical installation, commissioning and maintenance of
the entire measuring system must be performed by qualified staff who
have been trained in the field of explosion protection and have read and
understood all parts of the operating instructions necessary for the
actions to be carried out.
Please refer to the corresponding technical regulations (DIN, DIN EN, VDE,
VDI, and DVGW) for general information on mounting, commissioning,
taking out of service and maintaining. Below, we have listed the standards
and guidelines that must be observed:
DIN EN 60079-14, Publication date: 1998-08
, Electrical apparatus for
explosive gas atmospheres
– Part 14: Electrical installations in hazardous
areas (other than mines)
DIN EN 50110-1, Publication date: 1997-10,
Operation of electrical
installations
DIN EN 60079-17, Publication date: 1999-08,
Electrical apparatus for
explosive gas atmospheres
– Part 17: Inspection and maintenance of
electrical installations in hazardous areas (other than mines)
DIN VDE 0100-610, Publication date: 1994-04
, Erection of power
installations with nominal voltages up to 1000 V; initial verification