
Maintenance
9
gas-lab
Q1
Page 127
9.1.2 Fuse replacement
If the fuse must be replaced, this should only be executed by a service engineer
or trained expert for safety reasons.
For replacement of the fuse, it is necessary to open the housing of the gas-net
device. For open an officially sealed housing the presence of an officially
authorized person might be required.
Proceed as described below:
A fuse of the following type is required: cartridge fuse link 5 x 20 mm; 0.63
A (device with 1/3 mounting width) or 0.8 A (device with 1/2 mounting
width); slow-blowing fuse according to DIN.
Disconnect the supply voltage.
Loosen the 4 fixing screws on the back of the device. Two of these screws
could be hidden and secuted by (official) adhesive labels or seals.
Slightly withdraw the mounting rail.
Attention:
The boards are sensitive!
Avoid any contact with other components!
The fuse is on the bottom of the mounting rail on the board for the mains
connection. Unscrew the cover of the base using a screwdriver and replace
the fuse.
Re-assemble the device and connect the supply voltage.