
5
Functional description
Page 36
gas-lab
Q1
Now the actual status of the 1-point calibration is indicated on the display. Here
e.g. the required operation
–
switch on gas
(methane gas path 2
)
In case the methane is properly connected to gas path 2 (see beginning of
chapter), please invoke the menu and select the menu item
gas switched on
.
After confirming the calibration with methane proceeds automatically, whereas
the remaining time is displayed.
This process starts after approx. 2 minutes for purging and lasts for 10 minutes.