
Testing
12
© Gardner Denver Deutschland GmbH
59
/
60
09.2013 · 610.44495.40.310
Testing
Carry out the following tests after completing the maintenance:
▪
Insulation test
▪
Functional test
For installation and commissioning, refer to the corresponding chapter of the op-
erating instructions G-BH2 and the frequency inverter operating instructions.
12
Prematic AG, Märwilerstrasse 43, 9556 Affeltrangen www.prematic.ch
Tel. 071 918 60 60, Mail: [email protected]