Action
Step
Turn the bottom nuts halfway down the bolts with your fingers.
4
Result: The jacking bolts are disengaged. The load cells support the vessel
frame.
Before starting batch operations
Before starting batch operations, verify that the instrument is clear of obstructions. De-
pending on site requirements, a functional check or load cell calibration might be required
before starting a batch.
Xcellerex XDUO 2500 Mixer Operating Instructions 29146667 AH
149
6 Preparation
6.2 Stabilize the mixer vessel
6.2.1 Use jacking bolts