131
enabled flow control.
z
Loopback: Sets up Ethernet port to enable loopback testing function.
Example: Assign port to be Ethernet 0/0/1 and set up MDI as normal; Admin control
status as no shutdown, speed/duplex as auto, port flow control status as disabled flow
control and Loopback as no loopback. Then click Apply button and these set up items will
be applied to port 0/0/1.
Port list table displays the related information of the switch physical ports.
3.6.3 Bandwidth control
Click port configuration, Ethernet port configuration, Bandwidth control and proceed to do
port bandwidth control. 1
z
Port: Specifies configuration port
z
Bandwidth control level: port bandwidth control. The unit is Mbps and the value
range is 1~1000Mbps
z
Control type: Ingress means to control port bandwidth when receiving data
packet sent from outside the switch. Egress means to control port bandwidth
when sending data packets to outside of the switch. Ingress and Egress means
to control port bandwidth when both receiving and sending.
Example: Choose Port to be Ethernet 0/0/1, set up Bandwidth control level as 100Mb,
Control type as Ingress, then click Apply button. So the port 0/0/1 will execute bandwidth
control and receiving data packet with 100M.