
GEO3.5 MANUAL 51
REMOVING THE FRAME
Removal of the frame is required for access to the solenoid assembly, trigger bearing
carrier assembly and Break Beam Sensor System wires if maintenance on either is
required.
Disconnect any hosing and unscrew the inline regulator from the Front Regulator
Mount (FRM) as detailed in the ‘Cleaning the inline regulator’ section of this
Maintenance Guide.
Using a 5/64” hex key, remove the four screws that attach the GEO3.5 rubber grips
to the GEO3.5 frame
(see figure 21A)
.
Unplug the solenoid and the Break Beam Sensor System wiring harnesses from their
respective ports on the GEO3.5 circuit board
(see figure 21B)
.
Using a 1/8” hex key, unscrew but DO NOT REMOVE the front frame screw located
under the foregrip crown
(see figure 21C)
.
Using the short arm of a 1/8” hex key, loosen the rear frame screw 2-3 full turns
(see figure 21D)
.
Slide the frame backwards approximately half an inch so that the rear frame screw
disengages from the frame and remove the frame from the GEO3.5 body taking care
not to damage any wires
(see figure 21E)
.
You have now removed your GEO3.5 frame from the GEO3.5 body.
WARNING!
Always de-gas your marker, discharging any stored gas in a safe direction,
and remove the barrel, loader, air system and any paintballs to make the
marker easier and safer to work on.
If you are unsure about performing a maintenance procedure please
contact your nearest service centre.
WARNING
FIG 21A
FIG 21C
FIG 21E
FIG 21B
FIG 21D
Summary of Contents for GEO3.5
Page 1: ...ECLIPSE USER MANUAL ...