
Setup
Operating Instructions 911-210-10 - 00.0 - 06/2020
99
Fig. 63: Transporting the machine
To transport a machine
with rollers
:
1.
Loosen the nuts (1).
2.
Rotate the stand feet (2) fully upwards.
3.
Tighten the nuts (1) so that the stand feet (2) remain upwards.
4.
Roll the machine to the desired setup location.
5.
Loosen the nuts (1).
6.
Rotate the stand feet (2) downwards so that the stand is supported
evenly and firmly on all 4 stand feet (2).
7.
Tighten the nuts (1).
To transport a machine
without rollers
:
1.
Load the machine onto a lifting carriage or stacker.
2.
Move the machine to the desired setup location.
(1)
- Nut
(2)
- Stand foot
①
②
Summary of Contents for 911-210-3020-10
Page 1: ...911 210 10 Operating Instructions...
Page 6: ...Table of Contents 4 Operating Instructions 911 210 10 00 0 06 2020...
Page 10: ...About these instructions 8 Operating Instructions 911 210 10 00 0 06 2020...
Page 18: ...Machine description 16 Operating Instructions 911 210 10 00 0 06 2020...
Page 34: ...Operation 32 Operating Instructions 911 210 10 00 0 06 2020...
Page 112: ...Setup 110 Operating Instructions 911 210 10 00 0 06 2020...
Page 114: ...Decommissioning 112 Operating Instructions 911 210 10 00 0 06 2020...
Page 116: ...Disposal 114 Operating Instructions 911 210 10 00 0 06 2020...
Page 124: ...Troubleshooting 122 Operating Instructions 911 210 10 00 0 06 2020...
Page 127: ......