2 - 24
Description varix 200/varix 14 (DECT)
2 Planning a cordless communications network
2.8
Approval
The customer’s approval of the complete system must then be obtained. To this end, the latter
should be given a set of planning documents. An approval document is compiled and signed
by both parties. A suggestion for such a document is enclosed (Appendix 1, Chapter 2.10).
The locations of the base stations and the measuring points at the time of the site inspection
should be entered into the plans and numbered.