
TWO-HEAD DIMENSIONING SYSTEM REFERENCE MANUAL
20
2
Figure 20: 2-Head Dimensioning System Installation
– FRONT VIEW
2.4.9 Mounting Structure Assembly
When using the standard mounting structure provided by Datalogic, assemble as defined in
the application information provided with the structure.
NOTE:
This manual addresses standard two-head system installation. The
information provided here may be superseded by any application specific
drawings provided by Datalogic.
NOTE:
Depending on your specific installation, beam catchers may be
needed to avoid false dimensioning data points.
Tachometer
Direction of conveyor
travel is toward the
viewer
DM3610
HEAD 2
1200mm
[48”]
DC3000
Controller
CBX510
Monitor,
Mouse,
Keyboard
(optional)
Mount and angle the dimensioners based on
your application specifications.
DM3610
HEAD 1
Beam
Catchers
CD141
Display
Summary of Contents for DM3610
Page 1: ......
Page 25: ...MECHANICAL INSTALLATION 15 2 Figure 15 DM3610 Mounting Dimensions with UMB ...
Page 151: ...141 ...
Page 156: ......
Page 157: ......