Maintenance ■ Pick and Place Probe
- 114 -
Data I/O ■ 096-0465-001C
A spare Probe Assembly
comes with the
Self-Service Spares Kit.
Figure 69:
The Y-axis gantry ball screw and guide block, with cover
(left) and without.
3.
Apply grease directly to the linear guide. Wipe off any excess.
4.
Lubricate the Y-axis ball screw after
wiping off the old grease. Directly
apply new grease to the ball screw
sparingly. Wipe off any excess.
5.
Replace all guards and shields.
Replacing a PNP Probe Assembly
Technicians trained on the PSV5000 can remove and re-install a Probe
Assembly if it is damaged or malfunctioning.
Requirement
• Metric hex key set (Long set with extended reach is best)
• Spare Probe Assembly
To remove a Probe Assembly
1.
End a job and move the PNP head to the PARK position (click System
> Gantry > Tool) to move it to an accessible position.
2.
Properly shut down the PSV5000 System; refer to Shutting Down the
PSV5000 System on page
Summary of Contents for PSV5000
Page 12: ......
Page 36: ......
Page 160: ......
Page 161: ...Electrical Schematics for PSV5000 and Equipment ...
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......
Page 171: ......
Page 172: ......
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ...PROGRAMMABLE MEDIA EXPERTS ...