Additional Features
Materials Required for Preventive Maintenance
PSV5000 Owner’s Manual
- 95 -
Every
Quarter
Gantry guide rails
(every 100,000
devices or every
three months,
whichever comes
first)
Clean and lubricate quarterly, or sooner if the
gantry becomes noisy.
Page
110
Items to check Every Six Months
6-mos.
PNP head
Check; tighten if necessary.
Page
Every
6-mos. or
as
needed
depending
on use
Laser Marking
System*
Fume Extractor
Clean the nozzle and extraction tube.
Replace the Pre-Filter.
Replace the main filter twice yearly, or whenever the
Filter System alarm sounds and blinks the red
lamp.
Page
Items to check Once a Year
Every year
programmers
Run conformance verification test using Data I/O’s
DAB. Or have a Data I/O Service Technician
perform the test. Customers with an APS contract
have some costs of the test covered in the
agreement.
• FlashCORE Programmers: DAB part number
910-2200-003 or higher.
• LumenX Programmers: DAB Kit 910-2211-001A
or higher.
Page
119
Every year
Vacuum Generator
silencers PNP head
Check vacuum generator silencers; replace as
necessary.
Page
109
* Denotes optional equipment
Materials Required for Preventive Maintenance
To perform preventive maintenance procedures on the PSV5000 System,
in general you need the following materials.
Summary of Contents for PSV5000
Page 12: ......
Page 36: ......
Page 160: ......
Page 161: ...Electrical Schematics for PSV5000 and Equipment ...
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......
Page 171: ......
Page 172: ......
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ...PROGRAMMABLE MEDIA EXPERTS ...