6.1.1 Safety Requirements of Mechanical Installation
7 Mechanical Installation - Frame size D, E and F
7.1.1 Planning the Installation Site
7.1.2 Receiving the Frequency Converter
7.1.3 Transportation and Unpacking
7.1.6 Mechanical Dimensions, 12-Pulse Units
7.2.3 Terminal Locations - Frame size D
7.2.4 Terminal Locations - Frame size E
7.2.5 Terminal Locations - Frame size F
7.2.6 Terminal Locations, F8-F13 - 12-Pulse
7.2.8 Installation on the Wall - IP21 (NEMA 1) and IP54 (NEMA 12) Units
7.2.9 Gland/Conduit Entry - IP21 (NEMA 1) and IP54 (NEMA12)
7.2.10 Gland/Conduit Entry, 12-Pulse - IP21 (NEMA 1) and IP54 (NEMA12)
7.2.11 IP21 Drip Shield Installation (Frame size D1 and D2 )
8.1 Connections- Frame Sizes A, B and C
8.1.1 Removal of Knockouts for Extra Cables
8.1.2 Connection to Mains and Earthing
8.2 Connections - Frame Sizes D, E and F
8.2.3 Power Connections 12-Pulse Drives
8.2.4 Shielding against Electrical Noise
8.3 Fuses and Circuit Breakers
8.4 Disconnectors and Contactors
Contents
FC 300 Design Guide
MG.33.BD.02 - VLT
®
is a registered Danfoss trademark
3