
When the relay option kit is ordered separately the kit includes:
•
Relay Module MCB 105
•
Enlarged LCP fixture and enlarged terminal cover
•
Label for covering access to switches S201, S202 and S801
•
Cable strips for fastening cables to relay module
The relay option does not support FC 302 frequency
converters manufactured before week 50/2004.
Min. software version: 2.03 (
15-43 Software Version
).
130BA709.10
1
LABEL
DISMOUNT RELAY CARD TO ACCESS RS485
TERMINATION (S801) OR CURRENT/VOLTAGE
SWITCHES (S201, S202)
Remo
ve jumper t
o ac
tivate S
afe S
top
12
13
18
19
27
29
33
32
20
39
42
50
53
54
61
68
CAUTION:
SEE M
ANU
AL / R
CD and high leak
age cur
rent
VOIR M
ANU
AL / F
ransk t
ekst
WARNING:
Stored char
ge /
“Fransk t
ekst
” (4 min.)
LISTED 76x1 134261
INDUSTRIAL C
ONT
ROL EQUIP
MENT
SEE M
ANU
AL FOR PREFUSE
TUPE IN UL
APPLIC
ATIONS
T/C : CIA
XXXPT5B20BR1DBF00A00
P/N : X
XXN1100 S/N: 012815G432
IN: 3x380-480V 50/60H
z 14.9A
OUT
: 3x0-Uin 0-1000H
z 16.0A 11.1 kV
A
CHASIS/IP20
Tamb M
ax 45C/113F
MADE IN DENM
ARK
9Ø
9Ø
Ø6
130BA710.10
1
DISMOUNT RELAY CARD TO ACCESS RS485
TERMINATION (S801) OR CURRENT/VOLTAGE
SWITCHES (S201, S202)
LABEL
Remove jum
per to activate S
afe Stop
13
12
18 19 27
32 38 2
28
42
39
53
50
5
616
9Ø
9Ø
DC-
DC+
A2-A3-B3
A5-B1-B2-B4-C1-C2-C3-C4
1)
IMPORTANT ! The label MUST be placed on the LCP frame as shown (UL approved).
WARNING
Warning Dual supply
How to add the MCB 105 option:
•
The power to the frequency converter must be
disconnected.
•
The power to the live part connections on relay
terminals must be disconnected.
•
Remove the LCP, the terminal cover and the LCP
fixture from the frequency converter.
•
Fit the MCB 105 option in slot B.
•
Connect the control cables and fasten the cables
with the enclosed cable strips.
•
Make sure the length of the stripped wire is
correct (see the following drawing).
•
Do not mix live parts (high voltage) with control
signals (PELV).
•
Fit the enlarged LCP fixture and enlarged
terminal cover.
•
Replace the LCP.
•
Connect power to the frequency converter.
•
Select the relay functions in
5-40 Function Relay
[6-8],
5-41 On Delay, Relay
[6-8] and
5-42 Off
Delay, Relay
[6-8].
NOTE
Array [6] is relay 7, array [7] is relay 8, and array [8] is relay
9
Relay 7
NC
NC
NC
Relay 9
Relay 8
1
2
3
12
130BA162.10
7
5
4
6
8
9
10
11
130BA177.10
8-9mm
2mm
Options and Accessories
FC 300 Design Guide
242
MG.33.BD.02 - VLT
®
is a registered Danfoss trademark
10
10