![Daikin ARK25BVMB Service Manual Download Page 62](http://html.mh-extra.com/html/daikin/ark25bvmb/ark25bvmb_service-manual_501295062.webp)
SiBE04-302
Control Specification
Function and Control
53
3.11
Defrost Control
Outline
Heat Pump Only
Defrosting is carried out by the cooling cycle (reverse cycle). The defrosting time or outdoor
heat exchanger temperature must be more than its fixed value when finishing.
Detail
Conditions for Starting Defrost
The starting conditions must be made with the outdoor air temperature and heat exchanger
temperature. Under the conditions that the system is in heating operation, 6 minutes after the
compressor is started and more than 44 minutes of accumulated time pass since the start of the
operation or ending the defrosting.
Conditions for Canceling Defrost
The judgment must be made with heat exchanger temperature. (4°C~22°C)
Frequency
Compressor
Four way valve
Fan
Electronic expansion
valve opening
ON
OFF
ON
OFF
ON
OFF
0Hz
5sec.
30pps
55pps
55pps
Initial opening
PI control
40pps
5sec.
45sec.
45sec.
650sec.
60sec.
(R2945)
Summary of Contents for ARK25BVMB
Page 17: ...Functions SiBE04 302 8 List of Function ...
Page 31: ...Specifications SiBE04 302 22 Specifications ...
Page 137: ...Check SiBE04 302 128 Service Diagnosis ...
Page 172: ...SiBE04 302 Outdoor Unit Removal Procedure 163 4 Remove the fan motor Step Procedure Points ...
Page 184: ...SiBE04 302 Others 175 Part 8 Others 1 Others 176 1 1 Explanation 176 1 2 Jumper Settings 177 ...
Page 195: ...Wiring Diagrams SiBE04 302 186 Appendix ...
Page 199: ...SiBE04 302 iv Index ...