8
|
Electrical installation
Installer reference guide
94
EGSAH/X06+10UDA9W
Daikin Altherma 3 GEO
4P598592-1A – 2019.12
a
X2M
14a
21
L
N
YC
Y2
1
2
3
1×
1×
b
3
Fix the cable with cable ties to the cable tie mountings.
8.2.8 To connect the changeover to external heat source
Wires: 2×0.75 mm²
Maximum load: 0.3 A, 250 V AC
Minimum load: 20 mA, 5 V DC
[9.C]
Bivalent
1
"6.2.2 To open the indoor unit"
55]):
1
Top panel
3
1
2
4
2
User interface panel
3
Front panel
4
Main switch box cover
2
Connect the changeover to external heat source cable to the appropriate
terminals as shown in the illustration below.
Summary of Contents for Altherma 3 GEO
Page 248: ...11 11 ...
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ...4P598592 1A 2019 12 Copyright 2019 Daikin Verantwortung für Energie und Umwelt ...