7
|
Piping installation
Installer reference guide
68
EGSAH/X06+10UDA9W
Daikin Altherma 3 GEO
4P598592-1A – 2019.12
NOTICE
When circulation in each space heating/cooling loop is controlled by remotely
controlled valves, it is important that the minimum water volume is guaranteed,
even if all of the valves are closed.
M2
M1
a
c
a
M3
a
b
d
d
a
External room thermostat
b
Remote outdoor sensor
c
By-pass valve (field supply)
d
Shut-off valve
Minimum flow rate
Minimum required flow rate
Heat pump operation
No minimum required flow
Cooling operation
10 l/min
Backup heater operation
No minimum required flow during
heating
7.1.4 Changing the pre-pressure of the expansion vessel
NOTICE
Only a licensed installer may adjust the pre-pressure of the expansion vessel.
The expansion vessel is field supplied. For more information on how to change the
pre-pressure, see the manual of the expansion vessel.
Changing the pre-pressure of the expansion vessel should be done by releasing or
increasing nitrogen pressure through the Schrader valve of the expansion vessel.
7.2 Connecting the brine piping
7.2.1 About connecting the brine piping
Before connecting the brine piping
Make sure the indoor unit is mounted.
Summary of Contents for Altherma 3 GEO
Page 248: ...11 11 ...
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ...4P598592 1A 2019 12 Copyright 2019 Daikin Verantwortung für Energie und Umwelt ...